Thursday, February 18, 2021

cnci certification

In the case of buildings with a distribution / dispersion network serving a number of PAUs less than or equal to 20, the distribution / dispersion network may be made with two fiber optic drop cables directly from the distribution point located in the main register. From it, where appropriate, the connection cables will come up to the plants to end directly at the PAUs.


In the case of buildings with a distribution / dispersion network that serves a number of PAUs greater than 20, the distribution / dispersion network can also be carried out with two fiber optic drop cables directly from the distribution point located in the main register, as long as the main pipeline that is designed allows it, and thus is justified in the project.


cnci certification

No comments:

Post a Comment