The demand forecast for lifts will be in line with the specific regulations applicable to this type of facility, particularly for safety reasons. For the supply of additional, courtesy or other services, the demand forecast may be made freely.


In any case, in the machine room of each elevator, control mechanism box or equivalent space, a pipe will be installed consisting of a 25 mm diameter tube that, starting from the main register of the RITI (or RITU) and equipped with the corresponding guide wire, will end in a catch register provided with a blind cover. In the connection panels or exit terminal blocks located in the main registers, for all the technologies that are installed, the corresponding provision will be made to service said room. "